Preparation & Engineering

The early stages of cable projects offer many opportunities to increase efficiency and attain both cost savings and quicker or easier project completion. Fundamental technical knowledge, combined with vast experience in solving countless practical challenges, are the keys to these benefits.

A.Hak Electron and its committed staff members offer the expertise in every relevant area to unburden organizations in every step of the Preparation & Engineering process. We do so for projects revolving around electrotechnical engineering, civil engineering, mechanical engineering or combinations thereof.

Our innovational strength is globally renowned for achieving practical and comprehensible solutions. These are aimed at creating the blueprints required for a solid and predictable project execution that leads to longlasting, reliable cables and corresponding facilities.


 

  • news

    High voltage networks connected High voltage networks connected

    High voltage networks connected

    For customer Reddyn, we connected an existing 150 kV network in the eastern Netherlands with a new 380 kV connection between the Netherlands and Germany.

  • projects

    MPP3 power plant Maasvlakte MPP3 power plant Maasvlakte

    MPP3 power plant Maasvlakte

    Construction of a 380kV cable trajectory from the MPP3 power plant to the TenneT station.

  • projects

    High Temperature Conductors for 110kV connection High Temperature Conductors for 110kV connection

    High Temperature Conductors for 110kV connection

    Assembly of High Voltage Conductors into a 110 kV connection

  • projects

    Connecting the Diemen power plant Connecting the Diemen power plant

    Connecting the Diemen power plant

    A.Hak Electron connected the NUON (Vattenfall) power plant to the existing grid in Diemen.